Residential · Kileleshwa, Nairobi
Bronze Glass Wardrobe Suite
Bespoke interior commission

01 / Curatorial narrative
Joinery, proportion and a room resolved.
Cream lacquered doors framed in bronze-tinted glass, with a full-height mirror column that doubles the room's light. The wardrobe wall reads as furniture, not fit-out.
The chamfered handle-less edge — a signature Royalwoods profile — runs the full height of every door, so the wall opens anywhere without a single visible pull.
- 28 m²
- Project zone
- 4 weeks
- Programme
- 2025
- Completion
The chamfered handle-less edge — a signature Royalwoods profile — runs the full height of every door, so the wall opens anywhere without a single visible pull.
02 / Craft archive
Project gallery & in-situ details
FIG. 02Fitted Wardrobes
Cream wardrobe wall with bronze-tinted glass doors and brass-edged frames - bespoke joinery by Royalwoods Interiors, Nairobi
FIG. 03Glass & Mirror Work
Bronze-glass wardrobe run viewed from the bedroom corridor - bespoke joinery by Royalwoods Interiors, Nairobi
FIG. 04Display Lighting
Full-height mirror column meeting bronze-glass wardrobe doors - bespoke joinery by Royalwoods Interiors, Nairobi
FIG. 05Fitted Wardrobes
Detail: chamfered handle-less door edge, a signature Royalwoods profile - bespoke joinery by Royalwoods Interiors, Nairobi
03 / Specification register
Craft palette & project scope
SPEC.01Fitted Wardrobes
Kileleshwa, Nairobi · commissioned scope
SPEC.02Glass & Mirror Work
Kileleshwa, Nairobi · commissioned scope
SPEC.03Display Lighting
Kileleshwa, Nairobi · commissioned scope
04 / Project methodology
From measured room to final reveal
A controlled sequence keeps design intent, workshop production and installation aligned.
Measured before it is made
The 28 m² project zone is surveyed, coordinated and translated into approved elevations before fabrication begins.
Fitted Wardrobes
The project scope — Fitted Wardrobes, Glass & Mirror Work, Display Lighting — is prepared as one coordinated package before the installation sequence begins.
Calibrated in the room
Over 4 weeks, the work is installed, aligned and snagged under real site conditions before handover.

